USPR Pipeline Replacement

Dates: November 2018

Location: Union Pacific Railroad right-of-way approx. 20 Miles north of Benson, AZ in Pima County.
Owner: Union Pacific Railroad
Contractor: Kinder Morgan / El Paso Natural Gas

Description: Completed a 100-foot long auger bore under a Railroad right of way – to support a pipeline replacement. Installed 100-feet of 24-inch steel casing utilizing a SBU. 

Method: Auger Bore
Results: Bore was completed successfully on schedule.